LG CRNN096SPM0 Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Preparing the indoor unit's piping and drain hose for
installation through the wall.
1) Route the indoor tubing and the drain hose in the
direction of rear left or right.
2)
Tape the tubing, drain hose, and the connecting
cable. Be sure that the drain hose is located at the
lowest side of the bundle. Locating at the upper side
can cause drain pan to overflow inside the unit.
If the drain hose is routed inside the room,
insulate the hose with an insulation material*
so that dripping from "sweating"(condensa-
tion) will not damage furniture or floors.
*Foamed polyethylene or equivalent is recommended.
3) Connecting the pipings to the indoor unit and
drain hose to drain pipe.
Align the center of the pipes and sufficiently tighten
the flare nut by hand.
Tighten the flare nut with a wrench.
When extending the drain hose at the indoor unit,
install the drain pipe.
4) Wrap the insulation material around the connect-
ing portion.
Overlap the connection pipe insulation material and
the indoor unit pipe insulation material. Bind them
together with vinyl tape so that there is no gap.
NOTICE
10 Indoor Unit
Installation
Connection of Piping
GAS LIQUID
Ø12.7[5.5kg
.
m] Ø6.35[1.8kg
.
m]
Ø15.88[6.6kg
.
m] Ø9.52[4.2kg
.
m]
Pipe Size[Torque]
Drain hose
Connecting
cable
Gas side piping
Liquid side piping
Drain hose
Loop
Indoor unit tubing Flare nut Pipes
Wrench
Indoor unit tubing
Open-end wrench (fixed)
Connection pipe
Flare nut
Vinyl tape(narrow)
Adhesive
Drain pipe
Indoor unit drain hose
Plastic bands
Insulation material
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14

Comentarios a estos manuales

Sin comentarios